Future production construction

Friday, 11th August 2006 at 22:37

It's time for another action-packed construction update from the future productions at Studios! We're currently 10 months away from the Toon Studio opening and around 15 months from Tower of Terror's grand opening, so whilst things are definitely coming together, they're coming together at quite a leisurely pace right now.,

Starting with Toon Studio, Cars Race Rally still remains a huge pit on the spot of the two pairs of turntables. The size of the pit, however, is quite impressive – it seems to be almost as deep as the JCB digger is high! The latest photos show the tarpaulin cover is still lining it – the next step from here should hopefully be concrete foundations poured. Over at Crush’s Coaster, work is still speeding along at EAC-speed, but since most of the ride is now hidden by the huge concrete walls, not a lot can be seen. The walls themselves have also continued to grow, with wide concrete sections being added along both the Flying Carpets and front sides of the coaster building. Some kind of steel supports are currently lying next to the outside dip, probably to be used on the sections of the building where the track leaves and re-enters, which are currently very wide gaps in the huge concrete wall sections.

Over at Tower of Terror, the most visible work is still going on at the rear, where the painters have now covered almost the entire surface in pale paint. A closer look reveals this work has also added texture to the bare concrete, an important element in allowing the Tower to look old and unloved. It’s unconfirmed when we’ll start to see the final paint colours added, but with another three sides still to be prepared for painting, we’re probably in for quite a wait. Take a walk around to the front of the attraction, though, and more progress can be seen right now. In addition to the concrete shell of the lower showbuilding edging ever nearer to completion, the last 24 hours have seen the wooden frames in the elevator openings at the front of the Tower finally removed!

You can see some of the latest Toon Studio photos here, whilst Tower of Terror photos from earlier this week can be seen here. Information sourced from these photos plus french Disney Central Plaza postings.

Never miss Disneyland Paris news: Follow on TwitterLike on Facebook

Book your Disneyland Paris 25th Anniversary trip at disneylandparis.com

NEW!

Subscribe to DLP Today now

Don't miss the next Disneyland Paris update — Enter your email address to receive notification of new posts by email.

Comments

+-Write a comment...

Note: Comments are moderated but will appear immediately if you have a previous approved comment on DLP Today (identified by your email address).

Disneyland Paris Special Offer

SUBSCRIBE

DISNEYLAND PARIS TODAY

Wednesday, 16th August 2017

Disneyland
Park
10:00 - 23:00
Walt Disney
Studios Park
10:00 - 20:00

ARCHIVES